Green Ammonia Plant Estimator Dashboard

Green Ammonia Plant Techno-Economic Estimator

A Dashboard by ATUL SINGLA

BASIC REQUIREMENTS

UnitsNH₃H₂N₂
kTPA———
TPD———
TPH———
Kg/hr———
kg/sec———
Nm³/hr———

POWER (in kW)

ConsumerSteam CaseAll Electric Case
Ammonia Unit
Electric Heater——
Syngas Compressor——
Nitrogen Compressors——
Ammonia Refrig. Compressor——
Process Pumps (BFW, etc.)——
Total Value——
Electrolysers
Electrolyser System——
Electrolyser BOP——
Total Value——
Cooling Tower
Pumps——
Fans——
Total Value——
ASU
Total Value——

ELECTROLYSER & STEAM ANALYSIS

ParameterValue
Installed Electrolyser (MW)—
Required Electrolyser (MW)—
Daily Op. Hours—
Steam Balance (Tonnes/hr)
Steam Generation Potential—
Steam Consumption Demand—
Steam Cycle Self-Sufficient?—

CAPEX & OPEX OVERVIEW

RequirementSteamAll ElectricCapexOpex
Waste Heat Boiler (WHB)—NoYesNo
Steam Drum—NoYesNo
Steam Turbine—NoYesNo
Surface Condenser—NoYesNo
Deaerator—NoYesNo
BFW Pumps—NoYesNo
Extensive Piping & Valves—NoYesNo