1. Vertical Clearances for Supports
What should supports be designed to provide regarding vertical clearances between finished grade and the bottom of piping, insulation, or support bar?
Explanation: Supports should be designed to provide specific vertical clearances between finished grade and the bottom of piping, insulation, or support bar, considering potential obstructions.
2. Crane Access & Tube Bundle Pulling
How should equipment and structures be arranged to permit crane access to service air coolers, compressors, and exchangers?
Explanation: Equipment and structures should be arranged to permit crane access, and exchanger tube bundles should be “jacked out” against the shell.
3. Access to Pumps
What clear access dimensions are recommended centrally under main pipe ways for small mobile equipment to service pumps/motors?
Explanation: Clear access of 4m vertically and 3m horizontally shall be provided centrally under main pipe ways for small mobile equipment to service pumps/motors.
4. Access to Lower Items to Grade (Lowering Area)
What clear access shall be provided at grade on the access side for lowering external & internal fittings, PSVs, control valves, etc., from elevated equipment/structure?
Explanation: Clear access shall be provided at grade on the access side for lowering external & internal fittings, PSVs, control valves, etc., from elevated equipment/structure.
5. Lighting and Obstruction Consideration
What should be considered when designing vertical clearances for supports according to Clearances in Layout?
Explanation: When designing vertical clearances for supports, consideration shall be given to lighting or any other potential obstruction which may hang below bottom levels of structural supports.
6. Crane Access for Lowering Equipment
What should be considered when arranging equipment and structure to permit crane access for lowering equipment?
Explanation: Equipment and structure should be arranged to permit crane access for lowering equipment, considering accessibility for maintenance.
7. Tube Bundle Removal Space
What space should be provided for tube bundle removal according to Clearances in Layout?
Explanation: A clear space for tube bundle removal shall be provided according to Clearances in Layout.
Table of Contents
Don’t miss the Course on Effective Isometrics Management: Check Now
Enrollment Link
Recommended courses (Published on EPCLand)
- Complete Course on Piping Engineering
- Basics of Piping Engineering
- Piping Layout Engineering
- Piping Material Engineering
- Piping Stress Analysis
- Material Requisitions
- Piping Material Specifications
- Valve Material Specifications
- Plant Design & Layouts-OISD 118
- Isometric Management
Library of Technical Articles
Don’t miss out the collection of 15+ articles on following topics:
- Basics of Oil and Gas Industry
- Valves
- Testing
- Tank
- Piping Bulk Items
- Pipe
- Metallurgy
- Piping Materials
- Layout
- Instrumentation
- Heat Exchanger
- Type of Contracts
- Codes and Standards
- ASTM Standards
- Articles on Piping Specialty Items
Video details of Complete Course on Piping Engineering
Why Enroll in the EPCLand
Proven Track Record– PTR
Activities & Achievements before launching EPCLand
- Published more than 50+ short courses
- 3000+ Enrolments
- More than 3,500,00 Minutes of watch hours in the last 2 years
- 4000+ Students in 100+ Countries
- Rating of 4+ out of 5
- 1000+ YouTube Videos
- 8K+ Subscribers
What Students will Learn
- Codes & Standards of the Energy Sector
- Piping Material Engineering
- Piping Layout Engineering
- Stress Analysis
Interesting facts
- All the published courses have been developed by Industry Experts with more than 2 decades of experience
- Content is based on Practical experience and real-time problems.
- Content is designed and organized in such a manner that it can be easily grabbed.
- Complete website, Blogs and Quiz sections are Planned, Designed and published by myself (About me: Atul Singla)
- Complete flexibility of Time & Location, Students can access the content from anywhere & anytime
- Moreover, once enrolled, the content can be access as many times as you want, which helps in understand the fundamentals in a better way.
Conclusion
In conclusion, our courses are meticulously crafted by industry experts with over two decades of hands-on experience. The content is rooted in practical knowledge, addressing real-time problems. The material is thoughtfully designed and organized for easy comprehension. Every aspect, from the website to blogs and quizzes, has been planned, designed, and executed by Atul Singla, ensuring a comprehensive and seamless learning experience. With the flexibility of accessing the content at any time and from any location, students have the freedom to learn on their terms. Furthermore, enrollment grants unlimited access, allowing learners to revisit the material as often as needed, fostering a deep understanding of the fundamentals.